由營建人打造,為營建人打造。

施工確實。 請款無誤。

請款有信心,放款才安心。

eagle ai 確保施工成果與請款內容一致。

MERIDIAN STRUCTURAL CONTRACTORS  Progress Payment Application   |   No. 08 — June 2026 Application and Certificate for Payment Period: 06/01–06/30, 2026   Project: Riverview Tower — Phase 2   Date: June 30, 2026 Application Summary Certification 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 — Contractor's Certification: the undersigned certifies that the Work covered by this Application has been completed in accordance with the Contract Documents, and the amount certified is now due.— Retainage is withheld per the Contract Sum breakdown above and released upon Substantial Completion, subject to Owner and Field Verification approval of this Application. Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplier invoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.This Application is accompanied by executed Waivers of Lien for all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description Scheduled This Period % Comp. Ret. 10% Balance Status 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing $720k $680k $310k $295k $580k $630k $390k $86k $74k $52k $38k $61k $95k $58k 82% 76% 64% 55% 38% 71% 66% $18k $16k $9k $6k $7k $12k $8k $130k $163k $112k $133k $360k $183k $133k Certified Verified Matched Matched Covered Verified Verified MERIDIAN STRUCTURAL CONTRACTORS  Progress Payment Application   |   No. 08 — June 2026 Application and Certificate for Payment Period: 06/01–06/30, 2026   Project: Riverview Tower — Phase 2   Date: June 30, 2026 Application Summary Certification 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 — Contractor's Certification: the undersigned certifies that the Work covered by this Application has been completed in accordance with the Contract Documents, and the amount certified is now due.— Retainage is withheld per the Contract Sum breakdown above and released upon Substantial Completion, subject to Owner and Field Verification approval of this Application. Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplier invoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.This Application is accompanied by executed Waivers of Lien for all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description Scheduled This Period % Comp. Ret. 10% Balance Status 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing $720k $680k $310k $295k $580k $630k $390k $86k $74k $52k $38k $61k $95k $58k 82% 76% 64% 55% 38% 71% 66% $18k $16k $9k $6k $7k $12k $8k $130k $163k $112k $133k $360k $183k $133k Certified Verified Matched Matched Covered Verified Verified MERIDIAN STRUCTURAL CONTRACTORS  Progress Payment Application   |   No. 08 — June 2026 Application and Certificate for Payment Period: 06/01–06/30, 2026   Project: Riverview Tower — Phase 2   Date: June 30, 2026 Application Summary Certification 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 — Contractor's Certification: the undersigned certifies that the Work covered by this Application has been completed in accordance with the Contract Documents, and the amount certified is now due.— Retainage is withheld per the Contract Sum breakdown above and released upon Substantial Completion, subject to Owner and Field Verification approval of this Application. Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplier invoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.This Application is accompanied by executed Waivers of Lien for all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description Scheduled This Period % Comp. Ret. 10% Balance Status 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing $720k $680k $310k $295k $580k $630k $390k $86k $74k $52k $38k $61k $95k $58k 82% 76% 64% 55% 38% 71% 66% $18k $16k $9k $6k $7k $12k $8k $130k $163k $112k $133k $360k $183k $133k Certified Verified Matched Matched Covered Verified Verified MERIDIAN STRUCTURAL CONTRACTORS  Progress Payment Application   |   No. 08 — June 2026 Application and Certificate for Payment Period: 06/01–06/30, 2026   Project: Riverview Tower — Phase 2   Date: June 30, 2026 Application Summary Certification 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 — Contractor's Certification: the undersigned certifies that the Work covered by this Application has been completed in accordance with the Contract Documents, and the amount certified is now due.— Retainage is withheld per the Contract Sum breakdown above and released upon Substantial Completion, subject to Owner and Field Verification approval of this Application. Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplier invoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.This Application is accompanied by executed Waivers of Lien for all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description Scheduled This Period % Comp. Ret. 10% Balance Status 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing $720k $680k $310k $295k $580k $630k $390k $86k $74k $52k $38k $61k $95k $58k 82% 76% 64% 55% 38% 71% 66% $18k $16k $9k $6k $7k $12k $8k $130k $163k $112k $133k $360k $183k $133k Certified Verified Matched Matched Covered Verified Verified MERIDIAN STRUCTURAL CONTRACTORS  Progress Payment Application   |   No. 08 — June 2026 Application and Certificate for Payment Period: 06/01–06/30, 2026   Project: Riverview Tower — Phase 2   Date: June 30, 2026 Application Summary Certification 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 — Contractor's Certification: the undersigned certifies that the Work covered by this Application has been completed in accordance with the Contract Documents, and the amount certified is now due.— Retainage is withheld per the Contract Sum breakdown above and released upon Substantial Completion, subject to Owner and Field Verification approval of this Application. Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplier invoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.This Application is accompanied by executed Waivers of Lien for all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description Scheduled This Period % Comp. Ret. 10% Balance Status 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing $720k $680k $310k $295k $580k $630k $390k $86k $74k $52k $38k $61k $95k $58k 82% 76% 64% 55% 38% 71% 66% $18k $16k $9k $6k $7k $12k $8k $130k $163k $112k $133k $360k $183k $133k Certified Verified Matched Matched Covered Verified Verified
ANALYSING THE DOCUMENT... TABLE PHOTOS TABLE PHOTOS TEXT FORM Application for Payment G702 · Period Jun 30, 2026 Application No. 08 Meridian Structural Contractors 03 Conc. $4.28M 96% 07 Water $120k flag 09 MEP $1.24M 100% Schedule of values Item Amount Status Evidence Files 5 of 5 attached app-08-payment.pdf IMG-7214.jpg sov.csv Photos Export Payment Confidence Application No. 08 96/100 Eagle AI Score Confidence Safe Status Verified Evidence 214 photos Progress 82% Overall completion · 5 packages AI Summary Application No. 08 verified against 214 field photos and the schedule of values. Waterproofing flagged.
[ 作業流程 ]

現場資料到請款
一目了然。

從現場蒐集證據。
與工項範圍及請款內容比對。
安心核准。

現場照片、出貨單、出工日報與請款單——eagle ai 直接運用你的團隊本來就在產生的證據。

MERIDIAN STRUCTURAL CONTRACTORS Pay Application  |  No. 08 — June 2026 Application for Payment Period: 06/01–06/30, 2026    Project: Riverview Tower — Phase 2    Date: June 30, 2026 Application Summary 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplierinvoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.Executed Waivers of Lien accompany all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing Sched. Value $720k $680k $310k $295k $580k $630k $390k This Period $86k $74k $52k $38k $61k $95k $58k % Comp. 82% 76% 64% 55% 38% 71% 66% Ret. 10% $18k $16k $9k $6k $7k $12k $8k Balance $130k $163k $112k $133k $360k $183k $133k Status Verified Verified Matched Matched Covered Verified Verified Certification — Contractor's Certification: the undersigned certifies that the Work covered by this Application has beencompleted in accordance with the Contract Documents, and the amount certified is now due.— Retainage is released upon Substantial Completion, subject to Owner and Field Verification approval ofthis Application. Contractor — D. Alvarez, PM Field Verification — Eagle AI MERIDIAN STRUCTURAL CONTRACTORS Pay Application  |  No. 08 — June 2026 Application for Payment Period: 06/01–06/30, 2026    Project: Riverview Tower — Phase 2    Date: June 30, 2026 Application Summary 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplierinvoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.Executed Waivers of Lien accompany all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing Sched. Value $720k $680k $310k $295k $580k $630k $390k This Period $86k $74k $52k $38k $61k $95k $58k % Comp. 82% 76% 64% 55% 38% 71% 66% Ret. 10% $18k $16k $9k $6k $7k $12k $8k Balance $130k $163k $112k $133k $360k $183k $133k Status Verified Verified Matched Matched Covered Verified Verified Certification — Contractor's Certification: the undersigned certifies that the Work covered by this Application has beencompleted in accordance with the Contract Documents, and the amount certified is now due.— Retainage is released upon Substantial Completion, subject to Owner and Field Verification approval ofthis Application. Contractor — D. Alvarez, PM Field Verification — Eagle AI MERIDIAN STRUCTURAL CONTRACTORS Pay Application  |  No. 08 — June 2026 Application for Payment Period: 06/01–06/30, 2026    Project: Riverview Tower — Phase 2    Date: June 30, 2026 Application Summary 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplierinvoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.Executed Waivers of Lien accompany all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing Sched. Value $720k $680k $310k $295k $580k $630k $390k This Period $86k $74k $52k $38k $61k $95k $58k % Comp. 82% 76% 64% 55% 38% 71% 66% Ret. 10% $18k $16k $9k $6k $7k $12k $8k Balance $130k $163k $112k $133k $360k $183k $133k Status Verified Verified Matched Matched Covered Verified Verified Certification — Contractor's Certification: the undersigned certifies that the Work covered by this Application has beencompleted in accordance with the Contract Documents, and the amount certified is now due.— Retainage is released upon Substantial Completion, subject to Owner and Field Verification approval ofthis Application. Contractor — D. Alvarez, PM Field Verification — Eagle AI MERIDIAN STRUCTURAL CONTRACTORS Pay Application  |  No. 08 — June 2026 Application for Payment Period: 06/01–06/30, 2026    Project: Riverview Tower — Phase 2    Date: June 30, 2026 Application Summary 1. Original Contract Sum ....... $2,150,000 2. Net Change by Change Orders ....... $42,5003. Contract Sum to Date (1+2) ....... $2,192,500 4. Total Completed & Stored to Date ....... $1,556,9755. Retainage — 10% of Completed Work ....... $155,698 6. Total Earned Less Retainage (4-5) ....... $1,401,2777. Less Previous Certificates for Payment ....... $983,224 8. Current Payment Due (6-7) ....... $418,0539. Balance to Finish, Including Retainage (3-6) ....... $791,223 Retainage & Stored Materials Stored Materials Not Yet Incorporated in the Work: $22,000 — electrical switchgear, per attached supplierinvoice and bonded warehouse receipt.Retainage Withheld: 10% on Completed Work, 0% on Stored Materials, per Contract Documents Article 9.3.1.Executed Waivers of Lien accompany all Work and materials included in previous Applications. Continuation Sheet — Schedule of Values Description 031 Concrete 032 Formwork 041 Masonry 092 Drywall 099 Painting 260 Electrical 220 Plumbing Sched. Value $720k $680k $310k $295k $580k $630k $390k This Period $86k $74k $52k $38k $61k $95k $58k % Comp. 82% 76% 64% 55% 38% 71% 66% Ret. 10% $18k $16k $9k $6k $7k $12k $8k Balance $130k $163k $112k $133k $360k $183k $133k Status Verified Verified Matched Matched Covered Verified Verified Certification — Contractor's Certification: the undersigned certifies that the Work covered by this Application has beencompleted in accordance with the Contract Documents, and the amount certified is now due.— Retainage is released upon Substantial Completion, subject to Owner and Field Verification approval ofthis Application. Contractor — D. Alvarez, PM Field Verification — Eagle AI Delivery Tickets — June 2026 Materials received & bonded — Riverview Tower, Phase 2 Ticket Material Qty Status T-4471 Rebar #5 12.4 t Matched T-4488 Ready-mix 4000 psi 86 yd³ Matched T-4502 Electrical switchgear 1 lot Stored T-4515 Drywall 5/8” 240 shts Matched Source: supplier invoices · bonded warehouse receipts EAGLE AI FIELD CAPTURE Daily Photo Log — 06/28 42 photos · 6 zones · GPS + timestamp locked · auto-tagged to SOV line items 07:40 · Zone B Pour #12 slab 09:15 · Zone A Rebar insp. 10:50 · Zone C MEP rough-in 13:05 · Zone B Formwork strip 15:30 · Zone D Masonry core 16:45 · Yard Switchgear Source: site capture · Eagle AI evidence ledger Site Walk Notes DATE: 06/28/2026 - Pour #12 (Zone B): slab on deck complete — 4/4 cylinders castcure blankets on by 15:00photos tagged to SOV 031 ✓ - Verify w/ pay app: qty vs delivery ticket T-4488retainage 10% — confirm release datestored switchgear → bonded warehouse - Flags? L3 corridor conduit spacing?touch-up paint — zone D punch list CHECK BEFORE CERTIFYING! ref: PA-08 site sketch — Zone B

將每筆請款對照工項範圍、數量、公差與核准規則逐一比對,或一次跑完整個審核流程。

[ VERIFY ] [ MATCH ] [ AI REVIEW ] [EAGLE AI.] Reviewing evidence...

匯出可供稽核的請款套件:結構化項目資料、JSON,或 G702 格式的計價證明,直接接入你的 ERP、業主入口或會計流程。

[ 可供稽核的請款單 ]
▓▒░
[ 施工驗證 ]

檢測。分類。驗證。

eagle ai 讀取每一張現場照片,辨識工種與範圍,並對照你的圖說、規範、QA/QC 標準與請款項目,逐一檢核。每一筆核准都有證據支撐,而不是憑空假設。

驗證證據中…00%
CONC-031_L4-deck-pour.jpg
031 混凝土
結構
分類中
RBR-033_mat-B2.jpg
033 鋼筋
結構
已拍攝
ELEC-260_conduit-L3.jpg
260 機電
機電
已拍攝
DRY-092_corridor-B.jpg
092 輕隔間
裝修
已拍攝
WTR-071_deck-membrane.jpg
071 防水
室外
已拍攝
PAINT-099_zoneD.jpg
099 油漆
裝修
已拍攝
00 million
verified payment decisions
以真實執行衡量。

釋放你工地的潛力。

已部署於多個在建工地、複雜工項與真實請款流程。

1m+
平方英尺
管理中的工地面積
80+
工種
現場驗證中的工種
$3M+
交易金額
保障的付款範圍
140+
交付樓層
且持續增加

讓 eagle ai 審核你的下一份請款。

我們用你的真實專案文件做第一次試行審核。
看到成果後,再決定是否採用。

無需安裝軟體,沿用你現有的工具。